Decks & Patios
Deck repair, replacement, and patio projects with structure, access, and finishes assessed.
Plan the scope →Deck repair, replacement, and covered outdoor space start with the structure, the house connection, and the path from indoors to the yard.
Deck repair, replacement, and patio projects with structure, access, and finishes assessed.
Plan the scope →Covered outdoor space and related improvements, with structure and house connections reviewed.
Plan the scope →Trim, built-ins, and related carpentry matched to the project’s dimensions and finish expectations.
Plan the scope →Inspection items and planned repair lists assessed for cause, access, and appropriate trade scope.
Plan the scope →Photograph the surface, stairs, rails, posts, visible framing, and house connection from safe accessible positions. Note soft areas, movement, staining, and where water collects. Do not remove a guard or enter an unsafe area for photos. Ask what assessment is needed before pricing assumes that framing can stay.
The first review confirms project fit. Design, engineering, specialist assessments, permits, material selections, and construction responsibilities should be identified in the proposed scope. Availability and a final price require review of the actual property.
For a Marysville deck, separate surface wear from questions about framing, footings and the house connection. Include stairs, guardrails and any proposed cover. A photograph can start the conversation but cannot establish the condition of concealed structural connections.
Agree how doors, yard access and unsafe sections will be managed during work. Confirm design, permit and specialist responsibilities where applicable. Price the underlying scope before comparing finish materials so a board allowance does not hide required structural work.
Walk from the house through the deck and stairs against the agreed scope. Record finish and maintenance information, inspection tasks and any remaining site restoration. Keep drainage and adjacent surfaces in view instead of checking only the new deck surface.
New deck boards do not answer whether the supporting structure is suitable for reuse. Start with the structure, then decide on layout and materials. A new roof is a separate design question from a new walking surface.
Use the planning guide →Send your project details and include your location, priorities, and timing.